Heavy equipment
Heavy Equipment Transport: How Machinery Is Hauled
Heavy equipment transport across the 48 states: which trailer carries which machine, when a load needs a permit, and what we need to know to price it.
If it has wheels and an engine, it can be transported. Heavy machines are too heavy for a multi-car trailer and too big for an enclosed one, so they ride on trailers built for the job. We arrange heavy equipment transport across the 48 contiguous states.
What we move
- Construction equipment: skid steers, excavators, backhoes, loaders, dozers, rollers, lifts.
- Farm equipment: tractors and implements.
- Warehouse and yard equipment: forklifts and telehandlers.
- Trucks: box trucks, dump trucks, flatbeds and semi tractors.
Which trailer carries what
| Trailer | What it is | Used for |
|---|---|---|
| Hotshot | A heavy pickup pulling a flat gooseneck trailer | Smaller machines and single trucks, often the quickest to schedule |
| Flatbed | A flat deck about five feet off the ground | Machines that are not tall and can be lifted or driven on by ramp |
| Step deck | A flatbed with a lower main deck | Taller machines that would be over height on a flatbed |
| Lowboy | A deck close to the ground. On many, the front detaches so the machine drives straight on | The tallest and heaviest machines |
A deck near the ground makes loading easier and keeps the weight low, which keeps the load stable.
Legal size, and when a load needs a permit
- Width: 8 feet 6 inches on the main highway network.
- Height: set by each state, between 13 feet 6 inches and 14 feet 6 inches for the truck and load together.
- Weight: 80,000 pounds for the truck, trailer and load together on the Interstates, with limits on each axle.
A load over any of these needs an oversize or overweight permit. The federal government does not issue them. Each state on the route does, with its own rules on escort cars and the hours the load may travel. Permits take time, so tell us early.
What we need to know
- The make and model.
- Length, width and height as it will travel, and the operating weight.
- Attachments: buckets, blades, forks, booms. Say whether they stay on or come off.
- Whether it runs, steers and brakes.
- How it will be loaded and unloaded at each end: driven on, a loading dock, a crane or a forklift, and who provides it.
- Both addresses and what the access is like: a job site, a yard, a farm lane.
- Your dates.
Getting a machine ready
- Clean it. Caked mud is weight, and it falls off on the highway.
- Secure or remove attachments. Lower booms and buckets, pin what articulates, and lock the cab, covers and doors.
- Check for leaks and fix them or tell us.
- Leave about a quarter tank of fuel and a charged battery.
- Have the keys and any start-up instructions ready for the driver.
- Photograph it from every side, with dates.
What moves the price
Size and weight first, because they decide the trailer and whether permits and escorts are needed. Then the distance, how the machine is loaded, and how soon it has to move. We give you a price for your machine and your dates. Nothing is due to ask.
Pickup and delivery
Someone 18 or older has to be at each end to go over the machine with the driver and sign the bill of lading. If the site needs a crane, a forklift or a dock, it has to be ready when the truck arrives.
Common questions
How much does heavy equipment transport cost?
It depends on the size and weight of the machine, the trailer it needs, the distance and whether the load needs permits or escorts. Send us the make, model, dimensions and weight and we give you a price.
What is an oversize load?
One that is more than 8 feet 6 inches wide, taller than the state's height limit, or over the weight limit. It needs a permit from each state on the route.
Can you ship equipment that does not run?
Yes, if it can be winched, lifted or pushed onto the trailer. Tell us its condition and what is available at each end to load it.
Do I need a loading dock?
Not always. Many machines drive onto a low trailer by themselves. Others need ramps, a dock, a forklift or a crane. Tell us what you have.
How far ahead should I book?
As early as you can, and at least two weeks for a load that needs permits.
Get a price for your equipment
Two ZIP codes, what you are shipping and your first available date. It costs nothing to ask. For anything large or unusual, calling (888) 222-2065 is quickest.
- FMCSA licensed and insured
- MC-1302183, USDOT 3710693
- No payment to get a price
Your price
Or call (888) 222-2065
Sources
- Federal Highway Administration, commercial vehicle size and weight limits
- Federal Highway Administration, oversize and overweight permits are issued by the states
- FMCSA company lookup (search by MC or USDOT number)
Price and timing figures are Auto Transport Professionals planning estimates, updated November 2026. They are not quotes or guaranteed dates.

BBB rating A+See the BBB profile